The Planned Route

Iraq at the Center of Global Connectivity

Golden Line is planning a terrestrial fiber corridor that will traverse Iraq's strategic geography — the shortest overland path between Europe and the Arabian Gulf, creating a new axis of global digital trade.

10,000+km

Planned Fiber Route

<30ms

Target Europe–Gulf Latency

40%

Shorter than Submarine Alternatives

N+1

Planned Route Redundancy

The Corridor

Europe to the Gulf — Through Iraq

Iraq sits at the geographic heart of a corridor connecting three continents. Golden Line's planned fiber network will follow this natural land bridge — delivering lower latency and greater resilience than any existing submarine cable alternative.

1

Europe

Frankfurt · Amsterdam · London

2

Turkey

Istanbul Gateway

3

Iraq

Baghdad · Mosul · Basra

4

Gulf

Kuwait · UAE · Saudi Arabia

EuropeFrankfurt · Amsterdam · LondonTurkeyIstanbul GatewayIraqBaghdad · Mosul · BasraGulfKuwait · UAE · Saudi Arabia

Hover over nodes to learn more

Strategic Advantage

Why Iraq Changes Everything

40%

Shorter Route

Iraq's overland corridor is approximately 40% shorter than existing submarine cable routes between Europe and the Gulf — translating directly into lower latency and reduced signal degradation.

<30ms

Latency Target

Golden Line's planned network targets sub-30ms latency between Frankfurt and Kuwait — a significant improvement over current submarine alternatives that route around the Arabian Peninsula.

N+1

Built-in Redundancy

The network is being designed with N+1 route redundancy as a baseline standard — ensuring that no single point of failure can disrupt international traffic flows.

100 Tbps

Target Capacity

Planned initial capacity of 100 Tbps with a scalable architecture designed to grow with demand — future-proofed for the next generation of global internet traffic.

Development Roadmap

How We Are Building It

Phase 1

In Progress

Feasibility & Planning

Route surveys, geotechnical studies, regulatory engagement, and partnership development across all corridor countries.

Phase 2

Upcoming

Investment & Financing

Securing strategic investment, finalizing IRU agreements with anchor customers, and closing project financing.

Phase 3

Planned

Construction

Civil works, cable laying, and installation of repeater stations and PoP facilities along the full corridor.

Phase 4

Planned

Commissioning

Network testing, carrier interconnection, and commercial launch of transit and colocation services.

Get Involved

Reserve Capacity or Invest in the Corridor

We are in active discussions with international carriers, hyperscalers, and infrastructure investors. Early engagement shapes the network design and secures preferential capacity terms.